Dodger Stadium; The installation of grade beams and shear walls, approx 4600cys. The removal and replacement of 60,000 seats and the demo and replacement of 7000 connections throughout the stadium all completed within 1 off season or 4 1/2 months
Architectural Concrete, structural concrete elements and fins attached to an existing structure